Skip to content
Pakenham VIC, within 75 km
Call

HomeBusiness & commercial

Commercial & industrial mechanical services

One standard.
Every site.

Mechanical services, Type A gas and commercial hot water across Melbourne’s south-east and Gippsland. Directly employed crews, a written standard, and one person accountable for the package.

$20MPublic liability
12 yrsTrading from Pakenham
20Written procedures
Same daySWMS & certificates
On the roof, Pakenham
Craned in, commissioned, handed over.
Building kept trading
Before site access

Our numbers, up front.

Public liability
$20M
Refrigerant
ARC AU59557
Plumbing licence
46828
ABN
35 607 575 280
Trading since
2014
Base
Pakenham VIC

SWMS, certificates of currency and inductions supplied before site access, usually back the same day.

01 · The jobs we’ve done

The jobs we’ve done.

Named, with the job and the location against each. A reference you can ring is worth more than a logo you can’t.

  1. 01

    Westpac

    Branch fit-out

    BankingSale, Gippsland
  2. 02

    Commonwealth Bank

    Branch fit-out

    BankingVictoria
  3. 03

    Kane Constructions

    Tier-one builder, subcontract packages

    ConstructionVictoria
  4. 04

    Petbarn

    National retail rollout

    RetailMulti-site
  5. 05

    Greencross

    Vet clinics

    RetailMulti-site
  6. 06

    Reece Group

    Multi-site service contract

    Trade supplyVictoria
  7. 07

    Reliance Worldwide

    Industrial service contract

    IndustrialVictoria
  8. 08

    KFC

    Hospitality / QSR

    HospitalityVictoria
  9. 09

    Retirement Villages Constructions

    Aged care, heat pump upgrades

    Aged careVictoria
  10. 10

    Pakenham Springs P.S.

    Education

    EducationPakenham
02 · What we can do

What we can do.

Ten packages. A combination of them is normal, and still one price against one written scope.

  1. 01

    Tenancy & retail fit-outs

    Mechanical services for a new tenancy, delivered to the builder's programme.

    SuitsBuilders, national retail rollouts, tenancy coordinators
    What’s included →
  2. 02

    Base build mechanical

    The mechanical package on a new build, from the schedule through to handover.

    SuitsBuilders, developers, project managers
    What’s included →
  3. 03

    System replacement on live sites

    Swapping end-of-life plant on a building that cannot stop.

    SuitsFacility managers, building owners, asset managers
    What’s included →
  4. 04

    Scheduled maintenance

    Planned preventative maintenance that keeps a site compliant and the plant alive.

    SuitsMulti-site retail, aged care, education, industrial
    What’s included →
  5. 05

    Type A & Type B gas

    Gas appliance installation, servicing and compliance, domestic through to industrial.

    SuitsHospitality, aged care, industrial, education
    What’s included →
  6. 06

    Commercial hot water

    Hot water plant sized for a building rather than a household.

    SuitsHospitality, accommodation, aged care, gyms
    What’s included →
  7. 07

    Commercial evaporative cooling

    High-volume evaporative cooling for spaces that can't be sealed and chilled.

    SuitsWarehousing, manufacturing, workshops
    What’s included →
  8. 08

    Ventilation & kitchen exhaust

    Supply, exhaust and make-up air, including commercial kitchens.

    SuitsHospitality, QSR, industrial, carparks
    What’s included →
  9. 09

    Air balancing & commissioning

    Systems proved against the design figures and handed over with the numbers.

    SuitsConsultants, builders, building owners
    What’s included →
  10. 10

    Breakdown response

    A number that gets answered when the plant stops on a Friday afternoon.

    SuitsAnyone with a site that cannot be closed
    Call (03) 5947 8000 →
Licensed and equipped for
  • VRV / VRF systems
  • Ducted systems
  • Packaged rooftop units
  • Air balancing
  • Mechanical ventilation
  • Kitchen & exhaust ventilation
  • Type A gas
  • Commercial hot water
  • Heat pump plant
  • Split & multi-head
  • Controls & zoning
  • ARC refrigerant handling
  • System replacement
  • Commissioning & handover
  • Preventative maintenance
  • Breakdown response
Authorised installer ofTrade partner of Reece
  • DaikinVRV & ducted
  • MitsubishiElectric aircon
  • KadenAircon
  • BrivisGas ducted
  • ReclaimHeat pumps
  • iStoreHeat pumps
  • ThermannHot water

Direct supply means real stock, real warranties and no margin-stacking middlemen between you and the gear.

03 · Why people choose us

Why people choose us, and keep us on.

Nobody rings back about the ductwork. They ring back because the job never made work for them.

  • 01

    Our own crews

    Directly employed installers and apprentices. The crew in week three is the crew from week one.

  • 02

    The standard is written down

    Twenty procedures, not folklore held by whoever has been here longest. Ask to see them.

  • 03

    Documented on the day

    Photos, forms and certificates finished on site. Not reconstructed on a Friday afternoon.

  • 04

    Paperwork before boots

    SWMS, certificates of currency and inductions back the same day you ask for them.

  • 05

    One contact, start to finish

    Whoever prices it is who you ring about it. Not a call centre, not a ticket number.

  • 06

    We will tell you no

    If a scope needs something we cannot do properly, you hear it while you can still act on it.

How the job runs

What that looks like, start to finish.

  1. 01 · The plans

    We get the plans

    Drawings, a mechanical schedule, a site address: whatever you have. We read them properly before we quote, and if something is missing or does not add up we come back and ask rather than pricing around it and arguing later.

  2. 02 · The scope

    We put the scope together with you

    We write what we are actually going to do, in a form you can check line by line. Exclusions are stated, not buried. Where the drawings leave a gap we tell you what we have assumed, so nobody is relying on a different reading of the same page.

  3. 03 · The price

    Priced against that scope

    One price against one written scope. If the scope changes, and on a live site it usually does, it is repriced and approved before the work happens. No variations arriving with the invoice.

  4. 04 · On site

    We work to your program

    Install windows coordinated with the head contractor and the other trades. Staged, out of hours or over a weekend if the site has to keep trading. SWMS and inductions are back before anyone turns up, not on the morning.

  5. 05 · Signed off

    Commissioned, balanced, certified

    Systems commissioned and air balanced to the design figures, not to whatever falls out. Compliance certificates issued, defects closed before handover rather than after.

  6. 06 · Handover

    Handed over properly

    As-builts, O&M manuals, warranties and the commissioning data, in one handover. Then a maintenance contract from there if you want the plant to reach the life it was specified for.

04 · The people

Who you’re actually dealing with.

A family business in Pakenham since 2014. Whoever prices your package is who you ring about it.

Dean Winbanks

Dean Winbanks

Director · Licensed Plumber

Plumbing Licence 46828

Over twenty years across industrial, commercial and domestic work. He sets the standard every job is measured against, and he signs off every compliance certificate we issue.

Jake Deppeler

Jake Deppeler

Estimating & install

ARC AU59557

Reads every commercial enquiry himself and prices it off the drawings rather than off a square metre rate. If we have quoted it, he has been on the roof.

Behind us: directly employed installers and apprentices, in our own vans. No labour hire, no rotating subcontractors on your site.

05 · Our details

Our details, before you ask for them.

Certificates of currency and SWMS go out the same day you ask. The capability statement has the lot on one page.

Capability statement →

The entity

Legal name
Advanced Gas & Airconditioning Services Pty Ltd
Trading as
Advanced Gas & Aircon
ABN
35 607 575 280
ACN
607 575 280
Registered address
1 Sierra Circuit, Pakenham VIC 3810
Years trading
12

Licences & authorisations

Plumbing licence
Lic. 46828
Refrigerant handling
ARC AU59557
Type A gas
Appliance installation & servicing
Mechanical services
Design, install, commission

Insurance

Public liability
$20,000,000
Workers compensation
Current. Certificate of currency on request
Motor vehicle
Comprehensive, full fleet
Tools & plant
Covered

Safety & compliance

SWMS
Supplied before site access
Site inductions
Completed and returned within 24 hours
Documented procedures
Written SOPs, reviewed and version controlled
Job records
Photographs and forms against every job, retained
Compliance certificates
Issued on completion

Capacity

Workforce
Directly employed installers and apprentices, not subcontracted
Base
Pakenham, VIC
Service area
Melbourne's south-east and Gippsland, and further for contract work
Response
Priority attendance on contracted sites, after hours available
Before a first job

The questions that arrive before a first job.

What insurance do you carry?

$20,000,000 public liability, current workers compensation, comprehensive motor on the full fleet, and tools and plant cover. Certificates of currency go out the same day you ask. You do not need to chase them.

Can you meet a builder's program?

Yes, and we will tell you before we quote if we can't. Install windows are coordinated with the head contractor and the other trades, and we work staged, out of hours or over a weekend where a site has to keep trading. What we won't do is take a package we can't resource and then hold up the trades behind us.

How do variations work?

One price against one written scope. If the scope changes, and on a live site it usually does, it is repriced and approved in writing before the work happens. You will never get a variation arriving attached to the invoice.

Do you supply SWMS and site inductions?

SWMS are supplied before site access, and inductions are completed and returned within 24 hours. If your site uses a particular contractor management system, tell us which one and we'll get set up in it rather than sending you PDFs.

Are you licensed for refrigerant and Type A gas work?

ARC refrigerant handling licence ARC AU59557 and plumbing licence Plumbing Licence 46828, both current. Type A appliance installation and servicing, with compliance certificates issued on completion.

How far do you travel?

The standard service area is 75 km from Pakenham, which covers Melbourne's south-east. We travel further for rollout and contract work. The Westpac branch was in Sale. If you have multiple sites spread across the state, talk to us about it rather than assuming we're out of range.

Will you take a one-off job, or is it contract work only?

Both. A single plant replacement is a perfectly good first job, and it's usually how a maintenance contract starts anyway. There's no minimum.

Who actually turns up?

Our own people, in our own vans, in our own uniform. If we ever needed to bring in a specialist for part of a package, say a crane crew or a balancing contractor on a large system, we'd tell you who and why at quote stage, not on the day.

Plant down on a contracted site? Call (03) 5947 8000. After hours goes to someone on the tools.

Priced against a written scope

Tell us what you’re not being told.

Every mechanical package has a gap in it somewhere. The plans say one thing, the site says another, and whoever notices last pays for it. We find the gap and put it in the scope, in writing, before anyone signs.

  • One price against one written scope
  • Exclusions stated, not buried
  • Variations approved before the work, not with the invoice
  • SWMS and certificates back before anyone turns up
  • Jake reads every commercial enquiry himself
After you send it
Today
Read by the person who will price it, not a queue.
Inside a day
Questions back if the scope has a gap in it.
Then
One price against one written scope, exclusions stated.
Read by the person who prices it

Submit a scope.

Drawings, a mechanical schedule or a site address is sufficient to begin. Attach the plans if you have them.

Drawings & schedulesPlans, a mechanical schedule, a photo of the plant. PDF, DWG, Office or image, up to 8.0 MB each.

No obligation. We’ll tell you quickly if it isn’t one for us.

Call the team(03) 5947 8000Submit a scope →